Harbor Precision: Rehabilitation Beneath Active Shipping Canal
Client Objective:
Rehabilitate an aging 24-inch water main running beneath Los Angeles Harbor between San Pedro and Terminal Island without excavation, without disrupting active port operations, and without shutting down one of the busiest shipping corridors on the West Coast.
Railroad Innovation: First U.S. High-Pressure Crossing Solution
Client Objective:
Rehabilitate high-pressure pipeline beneath active railroad without disrupting operations.
High-Stakes Precision: Pipeline Repair on the Las Vegas Strip
Client Objective:
Repair a leaking pipeline between the Sphere and the High Roller Ferris wheel in Las Vegas under the Formula One racetrack in a very busy downtown area.
Ending the Cycle: 3,600-Foot Reclaimed Water Main Rehabilitation
Client Objective:
Restore system reliability, eliminate ongoing emergency repairs, and complete the rehabilitation with minimal impact on residents, traffic, and city operations.
Environmental Preservation: Tree-Root Rehabilitation in Established Residential Area
Client Objective:
Install high-pressure water main sliplining in an urban infrastructure corridor.
Winter Reliance: Cold-Weather High-Pressure Rehabilitation
Client Objective:
Rehabilitate a failing 8-inch ductile iron forcemain experiencing repeated failures during Northern Michigan's six-month cold-weather season without disrupting service or requiring extensive excavation through frozen ground and a busy intersection.
Harbor Precision: Rehabilitation Beneath Active Shipping Canal
Client Objective:
Rehabilitate an aging 24-inch water main running beneath Los Angeles Harbor between San Pedro and Terminal Island without excavation, without disrupting active port operations, and without shutting down one of the busiest shipping corridors on the West Coast.
Ending the Cycle: 3,600-Foot Reclaimed Water Main Rehabilitation
Client Objective:
Restore system reliability, eliminate ongoing emergency repairs, and complete the rehabilitation with minimal impact on residents, traffic, and city operations.
Environmental Preservation: Tree-Root Rehabilitation in Established Residential Area
Client Objective:
Install high-pressure water main sliplining in an urban infrastructure corridor.
Winter Reliance: Cold-Weather High-Pressure Rehabilitation
Client Objective:
Rehabilitate a failing 8-inch ductile iron forcemain experiencing repeated failures during Northern Michigan's six-month cold-weather season without disrupting service or requiring extensive excavation through frozen ground and a busy intersection.
Complex Urban Infrastructure: Railway Crossing Pipeline Solution
Client Objective:
Rehabilitate 675 feet of aging potable water pipeline beneath busy parking facility, hillside terrain, and active railway infrastructure without disrupting transportation operations or requiring excavation.